1) The equipment is designed for manual operation, and the loading and unloading of the tested products must be manual( Automatic loading and unloading by matching robot
2) The positioning and guidance of special design make the product materials such as appearance not damaged in the process.
3) The movement of each cylinder can be controlled by a separate control button. The solenoid valves of the equipment are double coil middle seal solenoid valves. All movements can ensure that the parts and operators are not damaged. Any movement requiring guidance must be equipped with 2 or more THK linear guides for positioning guidance.
4) Using ateq f6class (ateq f620) leakage detector, the equipment control system can realize automatic press fit and automatic test.
5) The tester model selection type: ateq f6class, f620 mechanical voltage regulation (electronic voltage regulation) 0.5 ~ 9BAR.
6) The equipment is equipped with independent lighting system and independent air source stabilization system. The equipment has the ability to monitor the air source pressure, give an alarm when the air pressure is not within the set range, and lock it out. The equipment is equipped with gas storage tank, which is used to detect the gas supply of gas path and working gas path respectively, so as to reduce the fluctuation of gas source. The air supply pressure of the equipment is 0.4 ~ 1.0MPa;
7) . the equipment includes independent electrical cabinet. The electrical cabinet of the equipment shall be the standard electrical cabinet imitating the Rittal model. The whole electrical system conforms to gb5226 national standard. The electric cabinet door shall be dustproof and sealed, and the protection grade shall be ip-54; The electric cabinet is equipped with an AC220V power socket and a lighting lamp. The switch is connected with the door of the electric cabinet.
8) The equipment I / O interface needs to be reserved to match with the whole line integrator. Meet the technical specification requirements of the whole line integrator. The electric circuit is arranged in a centralized way and connected with the clamp through the centralized aviation connector. Siemens smart 40 and 60 series PLC are selected, and 5 pairs of interfaces are reserved to meet the expansion requirements.
9) The equipment is equipped with Siemens or Advantech brand industrial computer, genuine operating system, and the storage capacity needs to be able to meet the data storage of one year;
10) The equipment is equipped with code scanning device (the brands of code scanning gun are geens sr750 and SR1000), and the two-dimensional code is one-to-one corresponding to the leak detection data;
11) The leakage test stability MSA of the equipment is ≤ 20%;
12) KEYENCE safety grating is selected for the equipment, with one hand start (mouse tail switch) and emergency stop button;.
13) The equipment needs to provide standard leakage and standard parts.